Final Hardware for Test of NASA's New Ares 1-X Rocket Arrives at Kennedy (2009)
2009 · Short film · 7 min
Synopsis
The four reusable solid rocket booster segments and the nozzle exit cone for the Ares 1-X rocket were delivered March 19 by the Florida East Coast Railway o the Jay Jay interchange with the NASA Railroad at Kennedy Space Center, Fla. This is the final hardware needed for the Ares 1-X's upcoming test flight this summer. It is manufactured by the Ares 1-X first stage prime contractor Alliant Techsystems Inc, or ATK. The train departed Utah March 13 on the seven-day, cross-country trip to Florida.…
Uploader's description on archive.org
Details
- Running time
- 7 minutes
More like this
- New Lightning Tower Stands at Pad for Constellation Program (2009)
- First Ares 1-X Rocket Flight Hardware Arrives in Florida (2008)
- Launch Platform for NASA Ares 1-X Flight Test Moves from Pad to VAB (2009)
- NASA Received First Stage Rocket Hardware for Ares 1-X Test Flight (2008)
- Roll Control System Arrives for NASA's Ares 1-X (2009)
- Shuttle Lightning Mast Removed from Kennedy Launch Pad (2009)
- Final New Lightning Tower Stands at Pad for Constellation Program (2009)
- NASA's Ares 1-X Rocket Booster Segments Delivered for Processing (2009)
- NASA Ares 1-X Parachutes Packed for Flight (2009)
- 'Rocket Top' Hardware for Ares 1-X Arrives at Kennedy Space Center (2009)