NASA Received First Stage Rocket Hardware for Ares 1-X Test Flight (2008)
2008 · Short film · 10 min
Synopsis
NASA's Kennedy Space Center welcomed the arrival of the Ares 1-X Forward Skirt on Nov. 10. The Forward Skirt is the initial piece of first stage hardware in preparation for the test flight of the agency's next-generation spacecraft and launch vehicle system targeted for July 2009. The hardware began its trip Nov. 7 from Major Tool & Machine Inc. in Indiana. Major Tool is the subcontractor to Ares 1 prime contractor Alliant Techsystems Inc., or ATK, in Utah. The Forward Skirt was delivered to…
Uploader's description on archive.org
Details
- Running time
- 10 minutes
More like this
- Final Hardware for Test of NASA's New Ares 1-X Rocket Arrives at Kennedy (2009)
- New Lightning Tower Stands at Pad for Constellation Program (2009)
- First Ares 1-X Rocket Flight Hardware Arrives in Florida (2008)
- NASA's Ares 1-X Rocket Booster Segments Delivered for Processing (2009)
- Launch Platform for NASA Ares 1-X Flight Test Moves from Pad to VAB (2009)
- NASA Ares 1-X Parachutes Packed for Flight (2009)
- 'Rocket Top' Hardware for Ares 1-X Arrives at Kennedy Space Center (2009)
- Roll Control System Installed for NASA's Ares 1-X Flight Test (2009)
- Roll Control System Arrives for NASA's Ares 1-X (2009)
- Shuttle Lightning Mast Removed from Kennedy Launch Pad (2009)