Final Newly Manufactured Segment for Ares 1-X Arrives at Kennedy (2009)
2009 · Short film · 6 min
Synopsis
The final newly manufactured segment specifically designed for Ares 1-X test rocket, the frustum, arrived at NASA Kennedy Space Center's Assembly and Refurbishment Facility on Friday. Looking somewhat like a giant funnel, the frustum's major function is to transition the primary flight loads from the upper stage to the first stage. Weighing in at approximately 13,000 pounds, the 10-foot-long frustum is composed of two aluminum rings that are attached to a truncated conic section. The large…
Uploader's description on archive.org
Details
- Running time
- 6 minutes
More like this
- 'Rocket Top' Hardware for Ares 1-X Arrives at Kennedy Space Center (2009)
- Roll Control System Installed for NASA's Ares 1-X Flight Test (2009)
- Roll Control System Arrives for NASA's Ares 1-X (2009)
- New Lightning Tower Stands at Pad for Constellation Program (2009)
- Shuttle Lightning Mast Removed from Kennedy Launch Pad (2009)
- Final New Lightning Tower Stands at Pad for Constellation Program (2009)
- First Ares 1-X Rocket Flight Hardware Arrives in Florida (2008)
- NASA's Ares 1-X Rocket Booster Segments Delivered for Processing (2009)
- Final Hardware for Test of NASA's New Ares 1-X Rocket Arrives at Kennedy (2009)
- Launch Platform for NASA Ares 1-X Flight Test Moves from Pad to VAB (2009)